Energy Park Sewage Pumping Station
Special Infrastructure Works - Energy Park Sewage Pumping Station Hadera
Project Description:
- Sewage Pumping Station at a depth of 14 m inside the groundwater, including an upper structure.
- Three main pumps with a capacity of 150 cubic meter per hour each.
- The soil is characterized by a layer of water that closes to a depth of 4 meter, a thick clay layer to a depth of 12 meter, and below groundwater of the coastal aquifer.
- Constructed a pressure pipe line and a gravity line under 5 railroads.
- Sewage Pressure line - HDD drilling. 355mm tube inside 560mm sleeve.
- Length 120 m. Depth of 6 m.
- Gravitation line - Spiral drilling. 400mm tube inside 800mm sleeve.
- Length 100 m. Depth of 8 m.
- The Sewage Energy Park Pumping Institute is at a depth of 14 meter inside the groundwater including an upper structure.
Additional details :
- Client: Hadera Municipality/Mey Hadera Corp.
- Project Cost: 16 million N.I.S.
- Services provided: Planning & Construction Management and Supervision.
- Status: Ended.